TrabalhosGratuitos.com - Trabalhos, Monografias, Artigos, Exames, Resumos de livros, Dissertações
Pesquisar

CINEMA PARA TODOS: Desenvolvimento de um sistema de venda de ingressos de cinema

Por:   •  12/5/2017  •  Trabalho acadêmico  •  13.629 Palavras (55 Páginas)  •  1.085 Visualizações

Página 1 de 55

UNIP - UNIVERSIDADE PAULISTA

 

LEONARDO GONÇALVES DE ARAUJO

LUCAS WILLIAN RAMOS SILVA

MATHEUS D’ LUCA HEGEDUS

VINICIUS DOS SANTOS LUCENA

 

 

 

CINEMA PARA TODOS:

Desenvolvimento de um sistema de venda de ingressos de cinema - pim

 

 

 

 

 

   SÃO PAULO

2016

LEONARDO GONÇALVES DE ARAUJO

LUCAS WILLIAN RAMOS SILVA

MATHEUS D’ LUCA HEGEDUS

VINICIUS DOS SANTOS LUCENA

 

 

 

CINEMA PARA TODOS:

Desenvolvimento de um sistema de venda de ingressos de cinema - pim

Trabalho de conclusão do semestre para obtenção de nota para o curso de Analise e Desenvolvimento de Sistemas e Redes apresentado à Universidade Paulista – UNIP.

Orientador: Prof. Giarduli

SÃO PAULO

 2016

LEONARDO GONÇALVES DE ARAUJO

LUCAS WILLIAN RAMOS SILVA

MATHEUS D’ LUCA HEGEDUS

VINICIUS DOS SANTOS LUCENA

 

CINEMA PARA TODOS:

Desenvolvimento de um sistema de venda de ingressos de cinema - pim

Trabalho de conclusão do semestre para obtenção de nota para o curso de Analise e Desenvolvimento de Sistemas e Redes apresentado à Universidade Paulista – UNIP.

Aprovado em:

BANCA EXAMINADORA

_______________________/__/___

Prof.

Universidade Paulista – UNIP

_______________________/__/___

Prof.

Universidade Paulista – UNIP

_______________________/__/___

Prof.

Universidade Paulista UNIP

RESUMO

O objetivo do presente trabalho é mostrar um sistema que foi desenvolvido para um cinema em linguagem C com especificações dadas pelo cliente, como diferentes tipos de ingressos, ter uma parte do sistema para realizar a gestão do caixa, um filme sobre temas especiais para alunos da escola publica da cidade com entrada franca na segunda feira. Com avanço da tecnologia torna-se mais rápido e seguro realizar tarefas, como administrar um cinema e um dos principais objetivos desse projeto foi trazer agilidade e modernização para esse cinema. Inicialmente iremos mostrar a rede que projetamos para definir como acontecerá a conexão dos computadores com o servidor e como será essa comunicação de modo que deixe os servidores trabalhando em condição agradável sem ser sobrecarregado para que possa ter o melhor desempenho para o servidor. Em seguida, mostraremos um cronograma que tivemos que programar cada passo do trabalho realizado e o ciclo de vida que escolhemos para ser seguido. E por ultimo, apresentaremos o código do sistema e suas telas.

Palavras-chave: Cinema. Sistema.

ABSTRACT

The purpose of the present work is to show a system that was developed for a cinema in C language with specifications given by the client, such as different types of tickets, to have a part of the system to perform a cash management, a movie about special topics for students of the School publishes the city with free admission on Monday. With the advancement of technology it becomes faster and safer to perform tasks such as managing a cinema and one of the main goals of the project for agility and modernization for this cinema. Initially we will show a network that we design to define how a connection of the computers to the server happens and how it will communicate so that it leaves the servers working in service nice without being overloaded so that it can have the best performance for the server. Next, we show a timeline that the program is programmed for each step of the work performed and the lifecycle we choose to be followed. And finally, we will present the system code and its screens.

Keywords: Cinema. System.

LISTA DE ILUSTRAÇÕES

Figura 1 - Topologia Estrela        8

Figura 2 - Direção de Fluxo de Dados (Full Duplex)        9

Figura 3 - Conexão Multiponto        9

Figura 4 - Tipo da Rede (LAN)        10

Figura 5 - Ciclo de Vida SCRUM e Team Roles        12

Figura 6 - Product Backlog        12

Figura 7 - Release Backlog e Sprints        12

Figura 8 - Burndown Charts        13

Figura 9 - Cronograma de Acompanhamento        13

Figura 10 - Tela do Menu Principal        23

Figura 11 - Tela do Dia da Semana        24

Figura 12 - Tela da Tabela de Filmes (Dia = 2)        24

Figura 13 - Tela dos Ingressos        24

Figura 14 - Tela das Poltronas        25

Figura 15 - Tela de Confirmação de Compra        25

Figura 16 - Tela dos Tickets        26

Figura 17 - Tela da Tabela de Filmes        26

Figura 18 - Tela das poltronas        27

Figura 19 - Tela de Lugar Ocupado        27

Figura 20 - Tela das Poltronas        27

Figura 21 - Tela de Lugar Selecionado        28

Figura 22 - Tela das Poltronas        28

Figura 23 - Tela do Numero de Poltrona Errado        28

Figura 24 - Tela de Confirmação de Compra        29

Figura 25 - Tela de Compra Cancelada        29

Figura 26 - Tela da Tabela de Filmes(Dia = 2)        29

Figura 27 - Tela de Ingressos (Filmes 5 e 6)        30

Figura 28 - Tela de Lugares Vagos        30

Figura 29 - Tela do Menu Principal        30

Figura 30 - Tela de Gestão do Caixa        31

Figura 31 - Tela do Menu Principal        31

Figura 32 - Tela de Sair        31

Figura 33 - Tela de Saída Realizada        32

Figura 34 - Tela de Sair        32

Figura 35 - Tela do Menu Principal        32

...

Baixar como (para membros premium)  txt (43.7 Kb)   pdf (814.2 Kb)   docx (589.7 Kb)  
Continuar por mais 54 páginas »
Disponível apenas no TrabalhosGratuitos.com