TrabalhosGratuitos.com - Trabalhos, Monografias, Artigos, Exames, Resumos de livros, Dissertações
Pesquisar

TERMINAL OCEÂNICO DA BARRA DO DANDE

Por:   •  17/3/2016  •  Trabalho acadêmico  •  634 Palavras (3 Páginas)  •  499 Visualizações

Página 1 de 3

[pic 6]

TERMINAL OCEÂNICO DA BARRA DO DANDE

[pic 7]

DAILY PROGRESS REPORT

[pic 8]

CC010 – EMC – SNL - DAILY PROGRESS REPORT - TOBD

Location: Barra do Dande

Contractor/Subcontractor: CIF

Date: Wednesday 09.03.16

Weather: Rainy

Temp: max 29°C, min 26ºC

Description of Activities Monitored:  

  • Civil:
  1. Checking the workmanship and plumbness of formwork installation for instrument cable trench at Zone 3-1
  2. Checking the installation of reinforcement bars Ø12 for instrument cable trench at zone 5-1 underground pipe network.
  3. Checking the dimensions after lean concrete prior on reinforcement bars installation at Zone 5-1 underground electrical cable.
  4. Checking the reinforcement bars and formworks installation of cover plates for underground pipe network at BUCG stock yard. The width of the cover is 500mm.
  5. Witnessed the concrete compressive strength test and result (30 Mpa) for underground pipe network.
  6. Checking the location and dimension of the masonry works at Laboratory Building prior on plastering works.
  7. Checking the Curtain Wall inspection at Dormitory & Lockers Building.
  8. Checking the verticality and plumpness of the columns at Laboratory Building.
  9. Checking the elevations for soil surface prior backfilling works for sleeper 3 and 5 at Zone 1 and 2 phase-I.

  • Mechanical:

  1. Visual inspection on the completed weld Pipe A1 and A2 at TK-1103A/B and TK-1104B/D.
  2. Visual inspection on the completed weld Pipe A1 at TK-1103/b AND TK-1104B/D.
  3. Witness of vacuum test on the bottom plates at TK-1104D.
  4. Checking the fitting and RT locations for piping of BUCG site.

Info:

  • Nothing to report on this section.

Comments or Suggestion:

  • Nothing to report on this section.

Miscellaneous

  •         Nothing to report on this section.

[pic 9]

[pic 10]

Checking the workmanship and plumbness of formwork installation for instrument cable trench at Zone 3-1

Checking the installation of reinforcement bars Ø12 for instrument cable trench at zone 5-1 underground pipe network.

[pic 11]

[pic 12]

Checking the dimensions after lean concrete prior on reinforcement bars installation at Zone 5-1 underground electrical cable.

Checking the reinforcement bars and formworks installation of cover plates for underground pipe network at BUCG stock yard. The width of the cover is 500mm.

PHOTOS: Civil

...

Baixar como (para membros premium)  txt (3.8 Kb)   pdf (482.4 Kb)   docx (348.8 Kb)  
Continuar por mais 2 páginas »
Disponível apenas no TrabalhosGratuitos.com