TrabalhosGratuitos.com - Trabalhos, Monografias, Artigos, Exames, Resumos de livros, Dissertações
Pesquisar

Sistemas De Corte E Dobra Convencional E Industrializado – Comparação Em Uma Obra Comercial Que Utiliza Os Dois Sistemas E Mão De Obra Terceirizada – Estudo De Caso

Por:   •  25/9/2023  •  Monografia  •  5.238 Palavras (21 Páginas)  •  79 Visualizações

Página 1 de 21

SOCIEDADE DE ENSINO SUPERIOR ESTÁCIO DE SÁ

CAMPUS SÃO JOSÉ–SC

IGOR VON RUNKEL DE ANDRADE

SistemaS DE COrTE E DOBRA CONVENCIONAL E INDUSTRIALIZADO – COMPARAÇÃO EM UMA OBRA COMERCIAL QUE UTILIZA OS DOIS SISTEMAS E MÃO DE OBRA TERCEIRIZADA – ESTUDO DE CASO

SÃO JOSÉ

2023


IGOR VON RUNKEL DE ANDRADE

SistemaS DE COrTE E DOBRA CONVENCIONAL E INDUSTRIALIZADO – COMPARAÇÃO EM UMA OBRA COMERCIAL QUE UTILIZA OS DOIS SISTEMAS E MÃO DE OBRA TERCEIRIZADA – ESTUDO DE CASO

   Trabalho de Conclusão de Curso à SOCIEDADE

 DE ENSINO SUPERIOR ESTÁCIO DE SÁ LTDA

         como requisito parcial para obtenção do título de bacharel em Engenharia Civil

SÃO JOSÉ

 2023


RESUMO

[pic 1]

ANDRADE, Igor Von Runkel. Sistemas de corte e dobra convencional e industrializado – comparação em uma obra comercial que utiliza os dois sistema e mão de obra terceirizada – Estudo de caso, 2023. Trabalho de Conclusão de Curso de Graduação de Baicharel em Engenharia Civil na Sociedade de Ensino Superior Estácio de Sá.

O processo industrializado de execução de armadura tem ganho espaço no setor da construção civil já o sistema convencional segue sendo o principal modo construtivo. As maneiras de escolher o correto, ainda pelas vantagens de projetos bem definidos ou pela falta de área de canteiro tem gerado a necessidade desta comparação. Foram obtidas informações de estudos bibliográficos e realizado um estudo de caso de uma obra comercial em Governador Celso Ramos, Santa Catarina. Tendo por finalidade aprimorar o processo executivo, este trabalho teve como objetivo comparar o método executivo convencional com o industrializado. O método tradicional adquire o aço em barras e executa os cortes e dobras na obra; já o método industrializado entrega o aço já cortado, dobrado e montado conforme especificações do projeto. Foi levado em consideração o preço do material e de mão de obra da região. Os resultados da comparação apontam para um desenvolvimento positivo da utilização do convencional, gerando uma economia de 4% no valor total do serviço. Estes resultados podem ser mais notáveis quando levados em consideração de se ter domínio do processo em obra e a reutilização das perdas consideradas pelas bibliografias em atividades complementares do projeto.

Palavras-chave: Corte e dobra de aço industrializado. Corte e dobra convencional. Processo Construtivo. Perdas de material.


ABSTRACT

ANDRADE, Igor Von Runkel. Conventional and industrialized cutting and bending systems - comparison on a commercial project that uses both systems and outsourced labor - Case study, 2023. Trabalho de Conclusão de Curso de Graduação de Baicharel em Engenharia Civil na Sociedade de Ensino Superior Estácio de Sá.

The industrialized process of steel cutting and bending execution has gained space in the civil construction sector, while the conventional system remains the main construction method. The ways of choosing the correct method, either through the advantages of well-defined projects or the lack of construction area, have generated the need for this comparison. Information was obtained from bibliographic studies, and a case study was carried out on a commercial project in Governador Celso Ramos, Santa Catarina, with the aim of improving the execution process. This study aimed to compare the conventional execution method with the industrialized method. The traditional method acquires steel in bars and executes cuts and bends on-site, while the industrialized method delivers pre-cut, bent, and assembled steel according to project specifications. The price of materials and labor in the region was taken into consideration. The comparison results indicate a positive development in the use of the conventional method, generating a 4% cost savings in the total service value. These results may be more notable when considering the mastery of the on-site process and the reuse of losses considered in complementary activities of the project, as stated in the literature.

Keywords: Industrialized steel cutting and bending. Conventional cutting and bending. Construction process. Material losses.


LISTA DE ILUSTRAÇÕES

Figura 01 – Diferentes etapas de perdas na produção........................................14

Figuras 02 e 03 – Estribadeira e estribadeira bidirecional...................................17

Figura 04 – Estribadeira bidirecional..................................................................17

Figura 05 – Dobradeira.......................................................................................17

Figura 06 – Pinos de dobra e suporte da máquina dobradeira............................18

Figura 07 – Cortadeira........................................................................................18

Figura 08 – Área para armazenamento de aço em barras, separados por bitola (vista superior) ...................................................................................................19

Figura 09 – Bancada de corte / Policorte............................................................19

Figura 10 – Bancada de dobra, pinos suporte e pino de dobra............................20

Figura 11 – Chave de dobra...............................................................................20

Figura 12 – Tesoura de corte..............................................................................21

Figura 13 – Máquina de corte.............................................................................21

Figura 14 – Serra de corte..................................................................................21

Figura 15 – Implantação e fases da obra............................................................23

...

Baixar como (para membros premium)  txt (35.1 Kb)   pdf (1 Mb)   docx (1.1 Mb)  
Continuar por mais 20 páginas »
Disponível apenas no TrabalhosGratuitos.com