Projeto para empresa
Por: jackennedy • 12/5/2015 • Trabalho acadêmico • 5.204 Palavras (21 Páginas) • 294 Visualizações
UNIP INTERATIVA
Projeto Integrado Multidisciplinar
Cursos Superiores de Tecnologia
PIM VIII – PROJETO EMPRESA CLEAN .
Pólo UNIPBrasília-Taguatinga (DF)
2012
UNIP INTERATIVA
Projeto Integrado Multidisciplinar
Cursos Superiores de Tecnologia
PIM VIII – PROJETO EMPRESA CLEAN.
Nome(s) completo(s) do(s) aluno(s):
Aluno 1 - Rafael F.P. de Oliveira
RA 1224160
Aluno 2 - Antonio Carlos Romanini
RA 1210273.
Aluno 3 - Alan Ricardo Lopes Gomes
RA 1233227
Aluno 4 - João E. Gomes
RA 1218101
Aluno 5 - Jaqueline Kennedy A. Soares
RA 1206376
Aluno 6 - Marcelo da Silva Santarém
RA 1131707
Curso: Gestão de Tecnologia da Informação
Semestre: 6º
Pólo UNIP Brasília-Taguatinga (DF)
2012
RESUMO
Este trabalho destaca a importância de criar a estrutura para o projeto de desenvolvimento da empresa Clean que é uma OSCIP (Organização da Sociedade Civil de Interesse Público) ela é regulamentada pela lei n° 9.790 de 23 de março de 1999 e esta apta a executar serviços de desenvolvimento em tecnologia de Software especializado nos Sistemas para Controles hospitalares, Sistemas para Gestão de Gastos Públicos que são direcionados para o Gerenciamento de gastos de Prefeituras, a empresa Clean atua também no desenvolvimento de Sistemas de Gerenciamento Integrado.
A Clean contratou a consultoria dos alunos do PIM que integrará a equipe de desenvolvimento de um software que terá a capacidade de Gerenciar o dinheiro publico, essa ferramenta deverá identificar possíveis falhas que poderão influenciar no atraso da entrega das obras publicas, também fiscalizará com muita exatidão se há o desvio de recursos financeiros, a ferramenta que os consultores (Alunos) irão utilizar tem como base o guia PMI-PMBOK alem das três disciplinas básicas e fundamentais para o desenvolvimento desse projeto, as disciplinas são: Qualidade de Software, Gerenciamento de Projeto de T.I e Empreendedorismo.
Com o aprimoramento e o estudo dos conceitos dessas matérias o grupo desenvolveu estratégias de empreendedorismo para incentivar empresas da iniciativa privada a adquirirem esse Software com a finalidade de controlar os seus própios Sistemas Financeiros.
O grupo esta determinado a utilizar estratégias para garantir a confiabilidade do Software e dessa forma garantir o sucesso do projeto, que além de solucionar falhas deverá estar adaptado para integrar os dispositivos móveis facilitando a otimização do gerenciamento e controle das informações, bem como ser disponibilizado para a comercialização.
Palavras-chave: Projeto, ferramenta, Controles, Tecnologia.
ABSTRACT
This work highlights the importance of creating the framework for the project development company that is a Clean OSCIP (Civil Society Organization of Public Interest) it is regulated by Law No. 9790 of 23 March 1999 and able to perform this service development in technology specializing in Software Systems for hospital controls, Systems Management Public Expenditures that are directed to the management expenses Prefectures, the company also operates in the Clean development Integrated Management Systems
The Clian hired consulting students PIM Will integrate the development team of software that has the ability to Manage the public Money, this tool should identify possible failures that may influence the delay of the delivery of public works also monitor very accurately if there is the diversion of financial resources, the tool that consultants (Students) will use is based on the PMBOK guide PMI-three subjects beyond the basic and fundamental to the development of this project, the disciplines are: Software Quality, project Management IT and Entrepreneurship.
With the improvement of concepts and the study of these subjects the group developed strategies to encourage entrepreneurship private companies to acquire this software in order to control their Propios Financial Systems.
The group is determined to use strategies to ensure the reliability of software, thus ensuring the success of the project, which in addition to troubleshoot failures must be adapted to integrate mobile devices facilitating the optimization of management and control of information.
Keywords: Project, Tool, Controls, Technology
SUMÁRIO
LISTA DE ILUSTRAÇÕES
Figura 01 – Cidade de Águas Claras 12
Figura 02 – shopping Quê..............................................................................................................13
Figura 03 – Planta Baixa das Instalações da Empresa Clean 14
Figura 04 – Gráfico 16
Figura 05 – Gráfico 17
Figura 06 – Gráfico de 17
Figura 07 – Gráfico de 18
Figura 08 – Gráfico de 19
Figura 09 – Gráfico .......................................................................................................................19
Figura 10 – Gráfico de Primeiro Contato......................................................................................... 23
Figura 11 – Gráfico o que faz o Cliente 24
Figura 12 – OTRS T.I Service Management ·. 32
Figura 13 – Softphone Kapanga 33
Figura 14 – Topologia de Rede Física 34
Figura 15 – Tabela de Orçamento dos Itens de T.I 35
Figura 16 – Organizações Prejudicadas por falhas em serviços 42
Figura 17 – Valor por Hora de Interrupção dos Serviços..................................................................40
...