                                                POSITION:-  Sub Sea Engineer

[pic 6]

TYPE OF MAINTENANCE                Inspection strip down

FREQUENCY                                By Calculation

Precautions and Warnings

Read data sheets on all products to be used on job and ensure all protective measures are taken and that all related safety equipment is in place and checked to ensure it is in operable condition.

Check and conform to all of the company’s safety procedures and instructions including this document.

Do not attempt field repair of flex joint parts.

This procedure covers only detection and replacement of defective parts. Cameron does not recommend field repair of any flex joint parts.

Hold work site meeting prior to starting job

Special Tools & Equipment Required

Power wrenches, crane and slings hand tools

References to other documentation relating to the task and the equipment

Read MSDS sheets for cleaning products

Procedure


Inspection Data book for riser joint Sn No

Date [pic 7][pic 8]

Data on main tube

Data on 15k lines

Data on 5k line

Data on hydraulic lines

Data on riser flange bolts

Data on riser flange nuts

Data on jewellery


Main tube inspection

Description of work

Stripped riser joint of all buoyancy and auxiliary lines and jewellery.

Removed seal sub and all riser bolts and nuts.

1. Inspected the riser box connector at each end of the main tube plus any welds around the tube in addition to the flange attachment welds and repaired as necessary.

2. Cleaned the inside of the box thoroughly with solvent and fresh water.

3. Inspected inside the RF riser connector for damage to the sealing area and

the running tool lock-ring groove area. Remove any small burrs using

#150 emery cloth.( see separate fig showing brinel points)

4. Used dye penetrant testing method and inspected for cracks in the area shown in the following figure. ( The main tube welds were x-rayed; not dye pen tested)

5. Ground out any suspect cracks to determine the depth of the crack.

[pic 9]

6. Cracks greater than.030" (0.76 mm) in depth repaired using Cameron welding specifications

7. Cracks less that .030" (0.76 mm) in depth were not weld-repaired. Blended the ground-out area into the original surface.

8. Lightly coated all internal surfaces and components with a water-resistant

mineral grease.

9. Inspected the seal sub for any signs of damage. Removed any burrs near

the seal groove area using #150 emery cloth.

10. Lightly greased the seals and the grooves with a water-resistant mineral

grease and installed new seals on the seal sub.

11 All main tube welds were x-rayed and films coded and cross referenced to this document.


[pic 10]

[pic 11][pic 12][pic 13][pic 14][pic 15][pic 16][pic 17][pic 18][pic 19][pic 20][pic 21][pic 22][pic 23][pic 24][pic 25][pic 26]

X-RAY RESULTS FOR MAIN TUBE WELDS

POSITION

PASS

FAIL

REPAIR

X-RAY I.D. Number

BOX END

PIN END

MAIN TUBE (BE)

MAIN TUBE (PE)


CHECKED FOR SIGNS OF BRINELLING IN THE LOCK RING GROOVE AND DAMAGE TO THE LOAD SHOULDER

PASS

FAIL

DAMAGE

ACTION    

RESULT  

RE-INSPECT  

[pic 27]


PERFORMED DIMENSIONAL INSPECTION AS SHOWN IN FIG BELOW

REF TABLE 2

[pic 28]

TABLE 2
                     ALLOWABLE BORE WEAR
DUE TO DRILL PIPE OR TOOL WEAR

Connection size Ins

21 X 0.688

Min pipe wall Ins

A

Max bore Ins

A

Max bore Ins

B

Max bore Ins

C

Max bore Ins

D

BOX END

0.619

1

19.

1

19.

1

19.

1

19.

BOX END

0.619

2

19.

2

19.

2

19.

2

19.

PIN END

0.619

1

19.

1

19.

1

19.

1

19.

PIN END

0.619

2

19.

2

19.

2

19.

2

19.

Comment

[pic 29][pic 30][pic 31][pic 32][pic 33][pic 34]


THICKNESS CHECK ON MAIN TUBE

[pic 35][pic 36]

Ser. No

Horizon

A

A1

B

B1

C

C1

D

D1

S1

WELD

29-4639-02

1

2

3

4

5

6

7

S2

WELD

8

9

10

11

12

13

14

S3

WELD