TrabalhosGratuitos.com - Trabalhos, Monografias, Artigos, Exames, Resumos de livros, Dissertações
Pesquisar

A Gestão de Projetos

Por:   •  30/4/2018  •  Projeto de pesquisa  •  6.462 Palavras (26 Páginas)  •  143 Visualizações

Página 1 de 26

Master ETL Architecture Design

For

Vendor Report Card

Submitted to

Target Corporation

[pic 5]

Submitted By

[pic 6]

Change History

[pic 7]

This document is located in Share Point at the following URL:

The following lists important changes that have been made to this document:

Version

Date

Prepared by

Comments

1.0

10-Jul-2006

Wipro


Table of Contents

[pic 8]

1.0        Introduction        5

1.1        Scope        5

1.2        Key Contributors        5

1.3        ETL Design Considerations        5

2.0        ETL Process- Technical Design        5

2.1        Data Extraction        7

2.2        Data Transformation        7

2.2.1        ETL-Surrogate Key Process        7

2.2.1.1        Background        7

2.2.1.2        Purpose        7

2.2.1.3        Overall Process Flow for Surrogate Key Generation        8

2.2.1.4        Process to Generate Surrogate Keys for New Records        8

2.2.1.5        Control Tables for ETL Surrogate Keys        9

2.2.2        

2.2.2.1        Approach 1: Process to Validate Foreign Keys and Business Codes        11

2.2.2.2        Approach 2: Process to Validate Foreign Keys and Business Codes        13

ETL Process        13

2.3        Data Loading        14

3.0        Scheduling        14

4.0        Restart and Recovery        15

4.1        Generic Restart Approach for Known Issues        16

5.0        Data Integrity        18

5.1.1        Background        18

5.1.2        Purpose        18

5.1.3        Scope        18

5.1.4        Process Flow        19

5.1.5        Process Details        19

5.1.6        Implementation Strategy        20

5.1.7        Datastage Export File        21

5.1.8        Assumption        21

6.0        User View Management        21

6.1.1        Approach-I        21

6.1.2        Approach-II        21

6.1.3        Implementation Strategy        21

6.1.4        Table Structures        22

7.0        Job Parameters        23

7.1.1        Job Parameters Tables        24

7.1.2        Table Structures        24

8.0        Data Purge        25

9.0        Partitioning Strategy        25

9.1.1        Database Partitioning        25

9.1.2        ETL Partitioning        26

10.0        Environment        26

11.0        Acronomy and Glossary        26

12.0        Appendix        26

12.1        Data Integrity        26

12.2        Data Model for Data Integrity Audit Table        27


  1. Introduction

The purpose of this document is to present the general design principles and technical approach for capturing, transforming and loading data into the VRC using the Ascential Datastage ETL tool.

Each release will follow identical (or very similar) processes as data is extracted from differing Sources and transformed into uniformly identified records available for further processing including standardized keys which allow tracking information back to original sources as necessary.

...

Baixar como (para membros premium)  txt (36.1 Kb)   pdf (1.1 Mb)   docx (590.5 Kb)  
Continuar por mais 25 páginas »
Disponível apenas no TrabalhosGratuitos.com